So at this point, I’m so far behind I have only the vaguest hope of getting things done a few days before Halloween. I don’t feel too badly–because of the move, I couldn’t have started any earlier.
The frame is glued down to the first wall. I measured everything very carefully for the frame…and still had to cut a few inches off the bottom of the wall. I want the wall to “float” a little, so there’s no extra pressure on it from sitting on the ground.
Also: power caulking gun. Just say yes.